(2016) 956 LMLN 1— London Arbitration 18/16 Arbitration 27 Jul Written By Louise Glover (2016) 956 LMLN 1— London Arbitration 18/16 “In a shipbuilding contract in which the builder defaulted by failing to construct two container vessels within an agreed time frame, it was held that the buyer was to have access to the same shipyard in order to continue construction of each vessel and that, furthermore, the builder was to provide all necessary assistance.”Vasilis BikakisE. G. Arghyrakis & Co.27th July 2016 Louise Glover
(2016) 956 LMLN 1— London Arbitration 18/16 Arbitration 27 Jul Written By Louise Glover (2016) 956 LMLN 1— London Arbitration 18/16 “In a shipbuilding contract in which the builder defaulted by failing to construct two container vessels within an agreed time frame, it was held that the buyer was to have access to the same shipyard in order to continue construction of each vessel and that, furthermore, the builder was to provide all necessary assistance.”Vasilis BikakisE. G. Arghyrakis & Co.27th July 2016 Louise Glover