Case Summaries
London Arbitration 18/23
Charterers under an NYPE T/C, challenged the delivery time specified by Owners, stating that the AIS had been turned off some 442 nm away and the Vessel could not have covered that distance in the intervening period. Owners’ argument that the Vessel speeded up was rejected as the logs produced in support were unconvincing (all in the same hand, allegedly produced from memory without aid of rough logs). Charterers failed however on their performance claim by not meeting a provision requiring their evaluation to be submitted latest 15 days after the passage in question.
London Arbitration 16/23
A T/C provided that Charterers were to redeliver the Vessel with “about” the same quantities of bunkers as on delivery and “should…difference….exceed 5%, Charterers shall compensate Owners losses …”.Charterers redelivered with some 13% less FO and 50% less MGO than on delivery. The Owners claimed as damages the market rates for the entire shortfalls, contending that the 5% allowance was not applicable if exceeded. The Tribunal held that within 5% gave rise to no breach and only awarded damages for the net shortfalls.
London Arbitration 15/23
Arbitrators rejected Time Charterers’ Weather Routing Company (WRC) performance analysis as it departed from the C/P parameters including as to swell and significant wave height (attributing 2m to DSS3) and failed to recognise routine navigational alterations, casting doubt on reliability generally. However, they found Owners in breach due to Vessel’s hull and propeller fouling, affecting performance and entitling Charterers to deduct for damages (albeit in a lesser amount than pursuant to their WRC analysis).
London Arbitration 14/23
Under a T/C, delays in berthing followed the Vessel’s grounding at her Mississippi River anchorage. With no berthing prospects in sight, and fearing another grounding, (but against advice of the local Pilots association), the Master shifted the Vessel to a 2nd anchorage where, as warned against, the Vessel swung 360◦ requiring her anchors to be disentangled with tug and pilot assistance. The Tribunal found (i) that although the first anchorage was safe for the Vessel, Charterers were nonetheless in breach of their ‘always afloat’ warranty and (ii) the Master’s choice was not unreasonable but the 2nd anchorage was unsafe, placing Charterers in breach of their warranty. Owners’ claims for the costs of re-floating, shifting, re-anchoring and disentangling the anchors succeeded, as did their claim for withheld hire during the delayed berthing (even that part of the delay caused by the Master’s late action to disentangle anchors).
London Arbitration 13/23
When the Vessel’s master fell ill and subsequently died, the Panama Canal Authority cancelled the pre-booked transit and placed the Vessel “on hold” pending production of contemporaneous negative Covid-19 PCR tests of crew/officers. Under the NYPE C/P, Charterers held the vessel off-hire from arrival until transit. Rejecting the claim, the Tribunal found that the situation did not fall within Cl.15 “any other cause” (there was no “whatsoever”). Nor within various additional clauses including “Off-hire” due to “threatened detention by any authority” – there was no detention as such; nor “Certificates and Vaccinations” - relating to advance certificates rather than transitory PCR tests; nor a “Panama…Canal” clause, relating only to Vessel fittings and suitability for transit.
London Arbitration 11/23
Under a T/C with maximum duration to mid-December 2019, Charterers redelivered late, in February 2020, with 165 MT HSFO (by then out-lawed by the IMO fuel regulations in force 1.1.20). Owners claimed in respect of post-redelivery time and cost of a trip to de-bunker, relying on cl. 10, which set out a sliding scale of permitted redelivery HSFO quantities to be endeavoured. The Tribunal dismissed Owners’ claims based on cl.10 (due to its non-mandatory nature) and on an implied term requiring zero ‘un-burnable’ ROB after 31.12.19 (as the situation was contemplated by neither party). However, ruling that rate differential was not the only measure of late-redelivery damages, the Tribunal held that cl.10 meant that de-bunkering was within the contemplation of the parties and resulting expenditure recoverable by Owners.